Detailes Of Steel Structure Hangar

Aircraft hangars are offen refered to as “dedicated garages” for aircraft. They can vary from simple “Masking” structures that protect all or part of the aircraft from elements to complex enviromental control and maintenance facilities in which robots apply radar-absorbing coatings. However, because the aircraft is designed for flight, it is necessary to minimize its maintenance time in the hangar and maximize the availability of flight. The armed force have developed the final design for the hangar facility to accommodate and maintainits aircraft.

Products Details

Detailes Of Steel Structure Hangar

Main Steel Frame Column Q235, Q345 Welded H Section Steel
Beam Q235, Q345 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical and Horizontal Support Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance system Roof Panel EPS Sandwich Panel / Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet
Wall Panel Sandwich Panel / Corrugated Steel Sheet
Accessories Window Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
Door Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door
Rainspout PVC
Live load on Roof In 120kg/Sqm (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Temperature Suitable temperature.-50°C~+50°C
Paint Options Alkyd paiting, two primary painting, two finish painting
(gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized.
Aircraft hangars are offen refered to as “dedicated garages” for aircraft. They can vary from simple “Masking” structures that protect all or part of the aircraft from elements to complex enviromental control and maintenance facilities in which robots apply radar-absorbing coatings. However, because the aircraft is designed for flight, it is necessary to minimize its maintenance time in the hangar and maximize the availability of flight. The armed force have developed the final design for the hangar facility to accommodate and maintainits aircraft.Fabrication 1. Production job based on steel building drawing designed by our engineer. 2. We also can make the products according to the drawing from customer. 3. Quality control work goes through every step during production. 4. Third Party Quality Check , customer on-site quality inspection and any other  reasonable inspection way, such as BV or SGS. Derust grade: Ball blasting Sa 2.5 on main steel structure, manual derust St2.0 on secondary steel structure. Delivery: Usually, if the steel structure quantity are not more than 500 tons, delivery will be within 45-60 days after the order confirmed. It depends on the fabrication quantity. Installation: 1. After production, we will supply steel building installation drawing. 2. Send techinican to guide installation on site if customer request.

Int’l Trade team: We have six internatioanl trade businessman onlines 24 hours.

Maintenance: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours